Construction of a new Design Centre at King Edward VI High School for Girls.
The new facility will support the delivery of GCSE Design and Technology and GCSE Computing from September 2022. The new centre will be joined to the existing Peter Bennett Centre, which will also be transformed to provide additional space for art, including enhanced exhibition space and an art library. Located within the centre of the school’s campus, and adjacent to the historic school buildings, coordination and segregation from the schools’ day-to-day operations is essential.
Work on the new Design Centre is scheduled to last until summer 2022.